- Client:Multinational Gold Producer
- Location:Obuasi, Ghana
- Duration:24 Months
- Scope:Equipment Rental · Fleet Maintenance · On-Site Support
Follow Us:
Project Overview
Madhda Global supported the expansion of a large open-pit gold mining operation in Obuasi, supplying a dedicated fleet for drilling, hauling, and material transport. The client’s priority was maximising uptime while controlling capital expenditure.
We deployed:

35 Ton Excavators

50 Ton Mining Trucks

Wheel Loaders
Our Role & Services
1
Long-term rental of mining fleet
2
On-site technical personnel stationed full-time
3
Preventive and corrective maintenance programs
Project Highlights
25% Boost in Ore Extraction Rates
due to fleet availability
Reduced Capital Investment
with flexible rental options
Client Feedback
Madhda Global’s fleet solutions gave us the confidence to scale our mining operations without the risk of equipment failures.
— Operations Manager, Gold Mine Expansion Project